It is a safe bet that when most departments are building a new station they never consider the possibility that one day they will need to expand the facility. The thought seems to be, “If we’re spending this much on a new station, surely we’re building all we’ll ever need.”

image

Locate site elements so that they do not interfere with future station additions.

However, most stations will have two or more major additions and renovations during their life spans. It only makes sense to plan for those future additions while planning the original facility. Having a design professional with that foresight is critical to your planning process.

Site Expandability

With the ever-increasing cost of land, most departments limit their property acquisition to the minimum necessary to fulfill the immediate need. When evaluating potential station sites consideration should be given to purchasing more acreage than is currently needed. Property costs will probably never be lower than now, so take advantage of the market if the budget will allow. If you are already in the station and an adjacent parcel becomes available, consider the opportunity of purchasing. Even if your department never needs the extra land for expansion, you can likely sell the additional parcel for a profit in the future.

Site utilities, such as water, sewer, gas, etc, can be increased in capacity with the first project to ensure that your future needs will be met without incurring the expense of complete upgrades. Larger meters, taps and lines are not inexpensive. But they’ll only be costlier in the future.

The placement of your new facilities on the site will prove critical in your ability to expand later on. If your site is at all larger than needed for the original facility, make sure you position built items so that the features that will potentially expand in the future have the room to do so. Make sure that the space between the portions of the building and driveways, parking lots, or other site features is adequate to satisfy future growth. Lay out driveways and parking lots that can easily be expanded. When a by-pass lane is designed into the apparatus site circulation configuration, it not only provides convenience for moving apparatus on site and extra parking for large visiting vehicles, but it may also prove to provide needed space in the future for adding apparatus bays.

A common mistake is to locate necessary features too close to the street right-of-way. It is predictable that roadways will widen in the next 75 years. Locating too close to the right-of-way means that someday you will likely lose important parking lots or outside apparatus staging areas.

Future roadways and road widening should be considered in your station site planning.

Other future related activities may be planned for the site. Many of theses activities may not be connected or even related to the station itself. Maintenance or storage facilities, training grounds or buildings, and helicopter pads are all potential activities that may be in your long-range expansion plans. Plan the eventual locations of these activities so that immediate placement of utilities, drives, parking lots, etc. can best serve the future plans with little or no disruption. A simple and inexpensive initial construction item is to put multiple, empty conduits under all driveway and parking lot intersections. This will make it possible to install all sorts of future utilities and lines without cutting and patching paved surfaces.

One of the challenges often encountered in the station site design process is the state or local Department of Transportation allowing multiple or wide curb cuts for emergency vehicle egress to the public roadway. Therefore, if you are planning for the future addition of vehicle bays that will egress straight out to the public roadway, you may need to consider making the initial curb cut wide enough for your future goals. This may let you avoid asking for a future widened curb cut in later on when the reviewing authority is not as agreeable.

Consider oversizing the above ground or below ground storm water detention capacity so that it is more likely to accommodate the increased future quantities necessitated by facility expansions. Also, give thought to where you are planning future expansions so that your landscape design in today’s project is not wasted in the future. For instance, unless the landscape ordinance requires it, do not plant large specimen trees where future bays will be added, making it necessary to cut them down when the additions are made.

If expansion is a major consideration while planning a new facility, these and many other ideas will become apparent.​

Since 1988, Ken Newell, AIA, LEED AP BD+C, has earned a national reputation for the programming and design of Public Safety Facilities that are functional, practical and budget-conscious. He has been directly involved in the planning and design of over 300 fire stations, EMS stations and Public Safety Training Facility projects designed by Stewart-Cooper-Newell Architects. Since 2000, Ken has become one of the most in-demand presenters at national Public Safety design conferences. His unique ability to deliver high-quality and educational presentations, on very practical topics, has earned him top ratings from audiences across the country.
Comments & Ratings
rating
  Comments

There is no comment.

Your Name
Email
Website
Title
Comment
CAPTCHA image
Enter the code


Daily Fire / EMS News

A collection of Fire / EMS -related news from around the web!

Get Aggregated RSS


View the full Fire - Rescue - EMS News section
for more articles

About the Carolina Fire Rescue EMS Journal

Welcome to the Carolina Fire Rescue EMS Journal! We want to provide you with timely online information and breaking news that best equips you to meet today’s emergency challenges. Among our firefighting articles, you will find the latest in firefighter technology, firefighter training, leadership development and the newest products and services presented in an “Act Now” user friendly format.  We want to be your best online source for the fire and rescue information, resources and reviews you need.
 
Regional Impact, National in Scope
  • Delivered free of charge to ALL fire departments, ambulance bays, rescue squads and hazmat teams in North and South Carolina
  • Quarterly circulation includes: fire academies, industry related technical schools and colleges and all major apparatus manufacturers
  • Regional & National trade show distribution
  • Largest circulated regional industry trade publication subscription base